The project consisted adding onto an existing metal building into a hard to access site on Lake Austin. Includes earthwork, new slab, structural steel, split faced block walls, HVAC, Electrical, Plumbing with 9 showers and 250 gallon boiler, custom orange lockers and flooring.
Architect
Owner